Quality you can check on paper
We record every step of your pour that can be checked.
Good concrete depends on the mix, the batching, the journey to site, and how it is placed, compacted and cured. We cannot see inside the concrete, so we record every step that can be checked.
What we record for your pour
- The grade and mix your engineer approved
- Plant batch records for each load
- Delivery challans with transit mixer number and time
- Slump test result at site
- Cube samples and 7-day and 28-day strength reports
- A quantity summary: ordered against delivered
On site with HENNECORE Concrete
Before the pour
A checklist covering access, pump position, shuttering readiness and labour.
During the pour
We observe placing and compaction and note each load.
After the pour
We follow up on curing.
What we do not claim
Our records are not a BIS or NABL certificate. Cube tests are done at a testing laboratory, and your structural engineer decides whether the concrete is accepted.
Tests and their frequency are agreed with you before the pour.